South Bay Pumping Plant (SBPP 3) Stage 3 – Testing, Start-Up and Engineering services in support of the South Bay Pumping Plant Stage 3 upgrade. DWR expanded its South Bay Pumping Plant with a new 69kV Switchyard, Dual 45MVA Transformers, 4160V Switchgear, four 4,000 Horse-Power pumps and auxiliary systems. The South Bay Pumping Plant Stage 3 provides drinking water to the residents of the South Bay Area. Power Pros developed the startup & test plan, performed the testing of all systems, alignment of the pumps & motors, authored the energization plan, supported the start-up of the new pumps, provided the final as-built drawings & test reports, and provided on- going support to the DWR staff.

The Power System Professionals
DWR has expanded its South Bay Pumping Plant with a new 69kV Switchyard, Dual 45MVA Transformers, 4160V Switchgear, four 4,000 Horse-Power pumps and auxiliary systems.
The South Bay Pumping Plant Stage 3 will provide drinking water to the residents of the South Bay Area. Power Pros developed the startup & test plan, performed the testing of all systems, alignment of the pumps & motors, authored the energization plan, supported the start-up of the new pumps, provided the final as-built drawings & test reports, and provided on-going support to the DWR staff.
- Date : 26.05.2014
- Location : Sacramento, CA